TEAM 14: Noise Mitigation in Organic Rankine Cycle Bypass Line

  • Verdicorp
  • ORC Schematic and Turbogenerator
  • Prototype Concept-Left and Actual Prototype-Right
  • On-site Measurements
  • Florida State University
  • Florida A&M University

Documents

Here you can find all of our course deliverables and presentations.

Final Engineering Day Presentation

The final presentation for our project, presented on Engineering Day, April 13, 2017.

Final Engineering Day Poster

The final poster for our project, presented on Engineering Day, April 13, 2017.

Design for Manufacturing, Reliability, and Economics

Spring Design report on the manufacturing, reliability,and economics of the Team 14 Prototype.

Team 14 Prototype Operations Manual

The operation manual for the Team 14 Noise Mitigation Prototype.

Design Review II Presentation

The second design review presentation, Spring 2017.

Design Review I Presentation

The first design review presentation, Spring 2017.

Restated Project Scope Presentation

Spring presentation on any changes or modifications to project goals.

Risk Assessment

Risk assessment compiled by Team 14 for this project.

Final Fall Report

The second midterm report - Final fall report.

Mid-Term Presentation 1

Team 14 Fall Poster.

Mid-Term Presentation 2

The second mid-term presentation.

Mid-Term Report 1

The first mid-term report covering background information and conceptual ideas in report form.

Mid-Term Presentation 1

The first mid-term presentation covering background information and conceptual ideas in presentation form.

Needs Assessment Report

Initial assessment report that covers background information about the project, including the needs and goal statements.

Code of Conduct

Code of Conduct report that delegates each team member's individual responsibilities as well as how each team should conduct themselves in the team environment.