Welcome to Senior Design
Team 5, Turbocor Sponsored, website. Navigate the site using the links
at the left in green. Take a look around and thanks for
visiting!
This design project was proposed by Turbocor in an effort to strengthen their manufacturing process that takes place locally in Tallahassee, Fl. The design team consists of 4 seniors of mechanical engineering. The project was assigned in August 2012, and has an expected completion time of April 2013.
This design project was proposed by Turbocor in an effort to strengthen their manufacturing process that takes place locally in Tallahassee, Fl. The design team consists of 4 seniors of mechanical engineering. The project was assigned in August 2012, and has an expected completion time of April 2013.
Deliverables
FALL
Code of Conduct
Needs Assessment
Project Scope
Concept Generation
Final Fall Report
SPRING
Operation Manual
Design for Manufacturing, Reliability, & Economics
Final Spring Deliverable
Presentations
FALL
Concept Generation
MEAC/ Interim Presentation
Final Fall Presentaion
SPRING
Spring Semester Midterm Update
Final Spring Semester Presentation
FALL
Code of Conduct
Needs Assessment
Project Scope
Concept Generation
Final Fall Report
SPRING
Operation Manual
Design for Manufacturing, Reliability, & Economics
Final Spring Deliverable
Presentations
FALL
Concept Generation
MEAC/ Interim Presentation
Final Fall Presentaion
SPRING
Spring Semester Midterm Update
Final Spring Semester Presentation