Welcome to Senior Design
Team 5, Turbocor Sponsored, website. Navigate the site using the links
at the left in green. Take a look around and thanks for
visiting!
This design project was proposed by Turbocor in an effort to strengthen their manufacturing process that takes place locally in Tallahassee, Fl. The design team consists of 4 seniors of mechanical engineering. The project was assigned in August 2012, and has an expected completion time of April 2013.
This design project was proposed by Turbocor in an effort to strengthen their manufacturing process that takes place locally in Tallahassee, Fl. The design team consists of 4 seniors of mechanical engineering. The project was assigned in August 2012, and has an expected completion time of April 2013.
Danfoss
Turbocor
Danfoss Turbocor Compressors is transforming the commercial HVAC market with innovative technology that redefines lifetime operating costs for mid-range chiller and roofop applications.
Sponsors
Dr. Farrukh Alvi
Department of Mechanical Engineering
Dr. Kamal Amin
Department of Mechanical Engineering
Dr. Chiang Shih
Department of Mechanical Engineering
Kevin Lohman
Mechanical Engineer, Turbocor
Julio Lopez
Manager of Hardware Design, Turbocor
Danfoss Turbocor Compressors is transforming the commercial HVAC market with innovative technology that redefines lifetime operating costs for mid-range chiller and roofop applications.
Sponsors
Dr. Farrukh Alvi
Department of Mechanical Engineering
Dr. Kamal Amin
Department of Mechanical Engineering
Dr. Chiang Shih
Department of Mechanical Engineering
Kevin Lohman
Mechanical Engineer, Turbocor
Julio Lopez
Manager of Hardware Design, Turbocor