Weekly Meeting
Date: March 17th, 2015 Team Number: 23 Team Leader: Matt Russo Webmaster: John Gregulak Other Teammates: Oluwatosin Olaleye, Marc Saint-Fleur, Randall Veliky Sponsor & Advisors: CISCOR, Dr. Chuy, Dr. Frank 1. Project Title: Development of a Wheel Force/Torque Sensor for Autonomous ATV 2. Project Objectives: Developed and test a sensor that is capable of mounting to an ATV and quantifying the Interaction between the wheel and the surface it is traveling over. 3. What was accomplished the last two weeks on individual tasks? (Please include Representative data and supporting documents.) Preparation for a Midterm Presentation. We all went through and discussed the slides needed and who will be presenting. We also decided which models will be represented and which ones will not be. 4. Summary of problems encountered and actions taken (and by whom): All arts are in but final circuit is not developed, the current circuit is not acceptable 5. Work planned for the next period and the person(s) responsible: 6. Open comments/suggestions: Weekly Meeting
Date: January 30th, 2015 Team Number: 23 Team Leader: Matt Russo Webmaster: John Gregulak Other Teammates: Oluwatosin Olaleye, Marc Saint-Fleur, Randall Veliky Sponsor & Advisors: CISCOR, Dr. Chuy, Dr. Frank 1. Project Title: Development of a Wheel Force/Torque Sensor for Autonomous ATV 2. Project Objectives: Developed and test a sensor that is capable of mounting to an ATV and quantifying the Interaction between the wheel and the surface it is traveling over. 3. What was accomplished the last two weeks on individual tasks? (Please include Representative data and supporting documents.) This meeting was in regards the parts needed to order and outstanding required parts. At this point the nuts, bolts and battery have not been reviewed and the list for the mechanical components are still in work and review 4. Summary of problems encountered and actions taken (and by whom): A proper circuit diagram for the proposed circuit and drawings of the sensor for the machine shop. 5. Work planned for the next period and the person(s) responsible: Randy-sensor drawings and required parts Tosin- Circuit drawing needed for concept to be produced 6. Open comments/suggestions: Meeting Minutes
January 30, 2015 Attendants: Matthew Russo Oluwatosin Olaleye Randall Veliky John Gregulak Marc Saint-Fleur Oscar Chuy Location: B347 Purpose: · Weekly Meeting to discuss progress · Discussed outcome of 1/29 staff meeting · Reviewed designed circuit and how to reduce noise Outcome: · Procured a new order list · Provided machine shop with metal needed to develop a prototype · Distributed assignments for up and coming week Assignments: · Marc: transfer calibration data to matlab, order new parts · Matthew/Randy: Determine ETA for prototype from machine shop provide any support req’d · Tosin: Determine ways to reduce noise in the circuit(filters, capacitors) · John: Program Microcontroller |
Archives
April 2015
Categories |