Team 10 has built the gurney and base mockup. The team is currently debugging the prototype, to prepare for Engineering Design Day on April 12th, 2018. The team must also create a space for a demonstrator to sit on top of the prototype. After presenting the project for Engineering Design Day, the team will compile all documents and drawings pertaining to the project. A final report of the project will be compiled and submitted to Lockheed Martin. This report will transfer information from the Engineering Design Team 10 to Lockheed Martin so the design can be implemented on actual F-16 Cockpit Simulators.

Timeline

Vertical timeline time intervals

April 9th, 2018 - Completely Functioning Prototype

April 12th, 2018 - Present Prototype at Engineering Design Day

April 27th, 2018 - Submit Final Project Report to Lockheed Martin