Post #4
04-11-11 11:39pm
We had to reschedule our meeting with the Physical
Therapist for today. We received positive feedback from her, stating
that there was a definite need for our product, and it was small and
concise enough to work. We are compiling everything to be on a CD
which will be turned in tomorrow. Pictures from the entire process
have been added into the media section now and soon all the
deliverables will be up as well.
Post #3
03-26-11 11:39am
At this point in time a majority of the coding has been
finished and the product is at
90% completion. We have scheduled a meeting with the
Physical Therapist for April 1st at 2:30pm in order to test our
final product. We are hoping to have everything completed and
debugged within this last week and in order to have time for any
minor changes or specification we see fit.
Everybody is working hard and will continue to do so until this
project is finally over and we can all relax.
Post #2
01-24-11 10:17pm
Good News Everyone!!!!!
Yesterday Trenton and Ricardo met up to do some work on the
Bluetooth connectivity and it looks like we'll be able to use JAVA
after all. The WIDCOMM installed fine on Ricardo's laptop, since he
had no other Bluetooth connectivity software before, and we were
able to run a few programs that let us take a look at the
accelerometer data in graphical format. Next step is to try and make
use of the infrared camera. The chair has also been
picked up and is currently sitting in Ben's car.
Post #1
1-11-11 10:32am
The website is currently being worked on. Additional content coming
soon.