Date: 10/17/2013
Project Title: Mars Lander Robot Recharger Students Names: Itiel Agramonte, Dean Gonzalez, Lucas Kratofil, Tyler Norkus, James Whaley Mentors/ Coordinator/ Sponsor: Dr. Moore, Dr.
Arora/Ivan Townsend, Michael Solomon |
1. Project Title: Mars Lander Robot Recharger |
2. Project Objectives/tasks
Breakdown: As stated in an e-mail from our sponsor: “NASA has an existing Martian Lander with several technologies on the deck. The Lander will generate power via a hydrogen fuel cell. This power needs to be transferred to excavators on the surface to charge batteries aboard excavators.” |
3. What was
accomplished the last two weeks on individual tasks- representative
supporting data/ documents Following the Staff Meeting two weeks ago, the team had a conference call with Michael Solomon and established communication. After several days and several phone calls, communication was established with Ivan Townsend. The team had a conference call with him and was able to begin work with more specific data in mind. (Entire Team) The team worked together to complete the Project Plans and Product Spec. (Entire Team). The team website was completed and uploaded. (Itiel and Tyler). |
4. Summary of
problems encountered and actions taken (and by whom) There were not many problems encountered these past two weeks, although the short time lapse between our initial sponsor contact and the Project Plan and Product Spec due date was too small. We asked for an extension. This was long enough to get on schedule. (Entire Team) |
5. Attached Gantt
chart modifications and analysis if project is behind schedule and summarize
actions planned to overcome the problems) We are not behind schedule, but attached is the Gantt chart for the team work, as well as the individual task breakdown. |
6. Work planned for
the next period and the person(s) responsible: The team is going to begin work on the design for the connector. (Entire
Team) Work will begin on the Charge Design. (EE students) Work will begin on the Arm Design. (ME students) |
7. Open
comments/suggestions (Please feel free to include your private comments): |
Coordinator/
Instructor assessment report and corrective action |
|