IFTP MODULES PLANNED TO BE DEMONSTRATED AT SEA ON R/V TRITON
Phase 2B (Jan - July 2001)
- DETERMINE SCOPE OF AT-SEA TESTING
- ESTABLISH SYSTEM CONFIGURATION
- TAILOR MODULE PERFORMANCE SPECIFICATIONS
- ESTABLISH EQUIPMENT, SYSTEM & AT-SEA TEST PLANNING
- PREPARE INSTALLATION PRELIMINARY DESIGN
Phase 3B
- DESIGN, BUILD AND FACTORY TEST TRITON PCM EQUIPMENT
- INSTALLATION AND CHECKOUT ON R/V TRITON
- AT-SEA TESTING ON R/V TRITON OF IFTP FUNCTIONALITY
- EQUIPMENT REMOVAL
-
-
R/V TRITON built for DERA by Vosper-Thornycroft
- Space Allowance for Testing IFTP Modules
- ~500 kW Ship Service Loads
- Two Side Hull Thrusters ~350kW each